Current studentsFamiliesFaculty & staffAlumni & donorsBusiness & industry
University of WesconsinPorter FallsForging day one from one day.
Offices & services

Facilities Management

The people who heat, clean, plow, fix, lock and build 14 buildings on 86 acres — how to ask for a repair, what gets plowed first, and what is under construction.

Home / About / Leadership / Facilities

About Facilities

Facilities Management keeps roughly 1.9 million square feet running, from the 1912 Founders Hall to the residence halls and the central heating plant. The department has 118 full-time staff in six shops and is led by Duane Kolsrud, director since 1998, who reports to the vice chancellor for finance and operations and holds the only complete set of keys to every building on campus, including two that no longer exist.

ShopCovers
Maintenance & TradesElectrical, plumbing, HVAC, carpentry, painting
Custodial ServicesAcademic buildings nightly; residence hall common areas daily
GroundsMowing, trees, the Riverfront Trail edge, snow and ice
Lock Shop & Access ControlKeys, card readers, door hardware
Energy & Central PlantSteam, chilled water, the solar array, metering
Capital Planning & ConstructionRenovations, new buildings, the master plan

Requesting a repair

Everything starts as a work order in the maintenance request system. Residents report room problems the same way. The system assigns a priority:

  • Emergency (flooding, no heat, gas smell, a stuck elevator, anything unsafe): call (715) 555–0145 during business hours or Campus Safety at (715) 555–0191 after hours. Response within one hour, around the clock.
  • Urgent (a broken classroom projector mount, a restroom out of order): within one business day.
  • Routine (a dripping faucet, a sticking door): within ten business days.
  • Projects (new shelving, a moved wall, paint in a color not on the approved list): estimated and billed to the department.

Last year Facilities closed 21,400 work orders; 93 percent of routine requests were finished on time.

Snow removal priorities

Crews start when two inches have fallen or ice is forecast, usually by 3:00 a.m. Clearing goes in this order:

  1. Emergency access routes, the Health Sciences Center, residence hall entrances, accessible routes and accessible parking.
  2. Main walks between Founders Union, the library and the academic quad; Porter Loop shuttle stops.
  3. Faculty, staff and commuter lots, in posted order.
  4. Secondary walks and steps. Some exterior stairs are closed for the season and signed.

Overnight lot rules are on winter parking. Whether campus closes is not a Facilities decision — see weather closings.

Capital projects

ProjectBudgetStatus
Founders Hall renovation (mechanical, accessibility, classroom tech), one wing per summer$15.0 millionDesign; construction summers 2027–2029
Advanced manufacturing & robotics lab$2.9 million ($2.4M federal grant + 20% match)Groundbreaking spring 2027; opens fall 2027
Kessler Hall HVAC and accessibility upgrade$6.2 millionBidding; construction summer 2027
Halvorsen Library 24-hour study addition$8.5 million (campaign-funded)Schematic design
Steam line replacement, Founders Drive$3.1 millionPhase 1 done; phase 2 summer 2027
Halvorsen Library fourth floor$1.9 millionCompleted May 2026

New construction and major renovations meet a LEED Silver minimum. Construction notices, detours and lane closures on Founders Drive are posted on the Facilities page in MyPorter the Friday before work starts.

Keys and card access

Most doors now open with the Porter Card. Access is requested by a department coordinator, not by the person who wants in; the steps, deposits and what a lost key costs are on keys and card access requests. Card changes take effect within one business day. Physical keys are cut only for spaces without a reader and are picked up at the lock shop with a photo ID. A lost master key means rekeying every door on that keyway, and the department pays for it.

Building hours and after-hours access are set by Facilities and Campus Safety together — see after-hours building access.

Fictional information

UW–Porter Falls is a work of parody. The work-order numbers, the plow routes, the capital budgets and the man with every key are invented; reporting a leak here will not send anyone with a wrench.